321

Above ground wastewater treatment plant, North of Stockholm, Sweden

Above ground wastewater treatment plant, North of Stockholm, Sweden

Location

North of Stockholm, Sweden

Project

Vacation home: septic system upgrade

System

BIOROCK-S System with ST1-2000 Primary Tank & BIOROCK-S Treatment Unit / UV disinfection (tertiary treatment)

Background

The client had no option to connect to the mains. As the Wastewater Treatment Plant was to be located in a stony area the client needed an above-ground plant but without noise and with minimum maintenance. It also required a high-quality final effluent: The last module includes a UV disinfection system.

Installation

Installation was carried out by one of our trained contractors and was completed in less than 2 days.

Želite stopiti v stik z nami?

Pozdravljeni, sem José Manuel Rodríguez , BIOROCK-ova International Sales Director. Stopite v stik z nami za BREZPLAČNO oceno projekta.

Kje se nahajate?

Kdo ste vi?

Vaši kontaktni podatki

Phone prefix is set automatically after selecting country

Katera vrsta izdelka vas zanima?

Če izberete drugo, to navedite v polju za opombe.

Vaše povratne informacije